Server Room & Datacentre (Data Center) Construction Turkey Solution Provider


1
Brand Name
Ctrltech
Offer Price
AED 100,000 AED 100,000 Save: AED 0
Listing Type
Offer
List Category
Electronics
Location
Al Nahda
Availability
In Stock (Cash on Delivery)
Shipping
Based on distance
Delivered in
20 days
Warranty
16 Months
Replacement Guarantee in
10 days
Last update

We offer
Turkey solution for Server room & Data center complete site Preparation. In
nutshell we offer Power, cooling and Monitoring solution for Tier I to Tier IV
Datacenter and server rooms. We specialize in planning, designing, engineering,
constructing Datacentre or Server room or Computer rooms with modern
technologies. We do sizing & selection of various equipment like datacenter
equipment such as UPS, Precision Air conditioner, Fire suppression, raised
flooring, water leak detection system, environmental monitoring system, Static
Transfer switch etc. As part of Datacenter and server room preparation, we do
supply installation and commissioning of following equipment:



                                                      



1)
Uninterruptible Power Supply (UPS): We offer Three phase or single phase,
redundant or standalone UPS with required battery backup time ranging from 1kvA
to 4800kVA.



2) Close
Control Unit (CCU) or Computer Room Air Conditioner (CRAC) or Precision Air
Conditioner: We do sizing, supply, installation & commissioning of CRAC
unit from 1kw to 180kw down/up flow type, chilled water or DX type.



3) Fire
Suppression: We offer clean fire suppression system such as HFC-227e agent
which is recommended for Server room and datacenter. Specialty of HFC-227e
agent is it is very quick and do not leave any residue. It also called as
FM200.



4) Raised
Flooring: We offer different type of raised flooring or access flooring along
with perforated tile for server room.



5) Water Leak Detection System.                        



6)
Environmental monitoring system for server room which can monitor temperature
& humidity in server room and can notify user through email, SMS or alarms.



7) Static
Transfer Switch (STS): We offer Single & Three phase static transfer switch
of 2 pole or 3 pole or 4 pole type.



8) Power
Backup, conditioning and security equipments such as Generator, ATS, Transient
voltage surge suppressor (TVSS), access control etc.



 



We are one
stop solution provider for building of Datacenter & Server room who can
convert your rooms in modern Datacenter. Server room, data center, datacenter,
server room preparation, server room construction, datacenter construction,
datacenter preparation, data center construction, data center preparation,
datacenter design, data center design, server room design, datacenter equipment,
server room design, datacenter design, server room designing, datacenter
designing, server room layout, serverroom, how to built server room, datacenter
services, what is data center, what is data center, it datacenter



 



--------------------------------------------------------------------------------------------------



 



CONTROL
TECHNOLOGIES FZE (Ctrltech)



Sharjah,
UAE.



T: +971 6
5489626



Mobile: +971
55 2338912 / +971 50 1537113



F: +971 6
5489627 

Ctrltech
Dubai, United Arab Emirates

065489626
REPLY TO THIS CLASSIFIED
7 + 8 =